Skip to content
HingeMax

Hydraulic-hinge for controlled door movement

A hydraulic-hinge uses hydraulic control to manage door movement, for door projects where the closing behaviour must be considered alongside the hinge fit.

Request a quote

Describe how the finished door should behave during use, including its relationship with the latch and surrounding frame. Share the door construction and any other closing hardware in the assembly. We can discuss the hydraulic series against that brief, then identify the drawings and model information needed before sampling. Specific movement functions depend on the selected model.

Hydraulic hinge — model pending — front view

Load selection by material

Read the weight columns as requirements for your enquiry. Model matches on this page come only from the hydraulic series. A material and weight combination needs its own supporting model information; the table does not imply that every combination is available. Confirm the door dimensions, hinge arrangement and fixing conditions before treating a load figure as applicable to your project.

Enquiry weight bands — model suitability must be confirmed
Material40 kg60 kg80 kg100 kg120 kg
Contact us for specification Contact us for specificationContact us for specificationContact us for specificationContact us for specificationContact us for specification

For material, finish and model-specific load conditions: Contact us for specification.

Compare hinge functions for your door

Start by separating door alignment from movement control. A project can need both, but a hydraulic description does not establish the adjustment functions or final closing behaviour of a model. Use the comparison to explain your priorities, then check the proposed hinge and door assembly together.

3D adjustable

Flush doors where alignment is the main requirement.

Discuss this option when the installer needs to align the leaf with the frame after fitting. Adjustment concerns the position of the door. It does not, by itself, establish that the hinge returns the door to its closed position. Ask for the model drawing and adjustment instructions.

Hydraulic

Doors whose brief includes controlled closing movement.

Bring this requirement into the discussion when the way the door closes matters to the project. Ask which movement functions the proposed model actually provides, how they are set and what door conditions apply. The hydraulic label alone is not a complete specification for a finished door assembly.

Soft-close

Interior door projects seeking a gentler final closing movement.

Describe the required closing behaviour and ask whether the proposed assembly can provide it. Soft-close is a function to verify, rather than proof of a separate material or load class. Confirm its compatibility with the door, latch and other hardware. Availability requires review of an actual model.

Compare the soft-close hinge enquiry guide. For project-specific changes, discuss OEM / ODM requirements.

Machining drawing and pocket dimensions

Request the machining drawing for the actual hydraulic model being considered. Provide the door edge profile, frame section and any restrictions around the fixing area. Review the drawing with the installer before preparing a routing template or ordering machined doors. A pocket drawn for another concealed hinge may differ even if the visible hardware looks similar. The space below remains reserved for the matched drawing.

Hydraulic hinge — model pending — machining pocket drawing
Use only the model-specific drawing confirmed for your order.

Installation in four steps

Use the selected model instructions for the actual work. The sequence below is a planning overview for discussion with your installer.

  1. Review the door and closing requirements

    Check the proposed model documentation against the finished door construction, weight and intended movement. Establish the required hinge arrangement and the support available in the leaf and frame. Include the latch and any separate closer in the review so the installer understands the complete assembly before machining starts.

    Hydraulic hinge — model pending — Review the door and closing requirements
  2. Prepare pockets from the model drawing

    Confirm the drawing revision and use the specified positions when setting up the machining template. Check the setup on a sample before cutting the finished components. Follow the model instructions for pocket geometry and fixing locations. This planning guide does not provide universal machining dimensions for hydraulic hinges.

    Hydraulic hinge — model pending — Prepare pockets from the model drawing
  3. Secure the hinge and hang the door

    Support the leaf while fitting the hinge components to the door and frame. Check the seating of the components and use the fixings specified for the assembly. Follow the documented mounting sequence. Keep any movement-control settings within the instructions supplied with the selected model rather than copying settings from another hinge.

    Hydraulic hinge — model pending — Secure the hinge and hang the door
  4. Check movement and latch engagement

    With the assembly supported as required, follow the model instructions for any available movement adjustments. Check the door through its intended travel and confirm that it reaches the required closed position with the latch. Inspect the fixings and clearances again before handover. Record the agreed installation settings for the project.

    Hydraulic hinge — model pending — Check movement and latch engagement

Frequently asked questions

What is the minimum order quantity?
The standard minimum order is 120 units. Different models and colours can be combined for standard purchases. Custom products follow the minimum quantity agreed for the requested work. Share the model mix and quantities with your enquiry so the quotation can distinguish standard supply from custom requirements.
What is the production lead time?
For standard orders of up to 5,000 units, preparation or production usually takes 20–30 working days after receipt of the deposit and confirmation of the order details. Larger or custom orders are discussed separately. These periods exclude transportation. The order confirmation should state the agreed preparation time and shipping arrangements.
Can I order samples first?
Samples are chargeable, with sample and shipping costs paid by the customer. Standard samples usually dispatch within 1–5 working days after payment and confirmation of the model and colour. Custom samples need a separate schedule. Dispatch time does not include transportation; request a sample quotation for the intended destination.
Can you cooperate with third-party testing?
Third-party testing (SGS / BV / Intertek) can be arranged on request. Share the intended door assembly, destination and requested test scope when making an enquiry. The proposed samples, laboratory arrangements, cost and timing need to be agreed for that request. Ask for written confirmation of the arrangement before sending samples or planning the project around a test date.
Can the product or packaging be customised?
Requests can include laser marking, packaging, colour matching and changes based on customer drawings. Send the artwork or technical brief with the intended quantity. Minimum quantities, development charges and production time depend on the work requested. Customer drawings are reviewed before agreeing a development or tooling plan; tooling costs are borne by the customer.
Can sample fees be credited against an order?
Paid sample fees can be fully credited against a later formal order that reaches the applicable minimum order quantity. There is no expiry period for that sample-fee credit. Shipping costs are excluded from the credit. For a custom product, the formal order must meet the minimum quantity agreed for that custom work.

Discuss your hydraulic-hinge enquiry

Send the door and frame drawings, finished leaf weight, intended closing behaviour, destination and expected order quantity. Include details of the latch and any other closing hardware. If your project already has a sample door or machining template, explain its current setup so we can identify the checks needed before quoting a model and sample arrangement.

Request a quote
WhatsApp